IOS Laydown Yard - 20 ac Prototype

Model ID: 69 Square Footage: 653400 sq ft
Bill of Materials
Total: Low $0 | Exp $0 | High $0
Per SF: Low $0 | Exp $0 | High $0
Component Division Qty Unit Low Exp High Total (Exp) Part #
US - Woven Geotextile Stabilization Fabric, 315 lb Grab 31 - Earthwork 68600.0 sq_yd $1.25 $1.75 $2.50 $120050.00 25C576
US - Crushed Aggregate Base Course, 8 in Compacted Section 31 - Earthwork 30800.0 ton_short $18.00 $24.00 $32.00 $739200.00 25C577
US - Silt Fence with Hardwood Stakes, 36 in 31 - Earthwork 3900.0 linear_ft $1.75 $2.50 $3.75 $9750.00 25C578
US - Chain-Link Fence, 6 ft Galvanized with 3-Strand Barbed Wire 32 - Exterior Improvements 3740.0 linear_ft $19.00 $26.00 $34.00 $97240.00 25C579
US - Cantilever Slide Gate, 30 ft Clear, Galvanized 32 - Exterior Improvements 2.0 ea $4200.00 $6500.00 $8900.00 $13000.00 25C580
US - LED Area Light, 300W on 30 ft Steel Pole with Photocell 26 - Electrical 12.0 ea $2600.00 $3600.00 $4900.00 $43200.00 25C581
US - Pad-Mount Electrical Service Package, 200A Yard Power 26 - Electrical 1.0 ea $6500.00 $9500.00 $14000.00 $9500.00 25C582
US - Ready-Mix Concrete, 4000 psi, Entrance Apron 03 - Concrete 85.0 cu_yd $145.00 $168.00 $195.00 $14280.00 25C583
US - Rebar, #4 Grade 60, Apron Reinforcement 03 - Concrete 3.2 ton_short $950.00 $1150.00 $1400.00 $3680.00 25C584
US - RCP Culvert, 18 in Class III 33 - Utilities 120.0 linear_ft $62.00 $85.00 $118.00 $10200.00 25C585
US - Corrugated HDPE Perimeter Drainage Pipe, 6 in 33 - Utilities 1200.0 linear_ft $3.50 $5.00 $7.50 $6000.00 25C586
US - Yard Signage and Wheel Stop Package 32 - Exterior Improvements 1.0 ea $2800.00 $4000.00 $5600.00 $4000.00 25C587