Home
Solutions ▾
Market Overview
Opportunities
Customer Intake
IRR Calculator
Suppliers
Credentials ▾
Michael Hoffman
Don Maxwell
Jey Smith
Tom Dowling
AGM Financial
BlackStar Construction
Contact
Login
Edit Model: Secured Truck Parking Yard + Cardlock Fuel - 10 ac / 150 Stall Prototype
Save
📄
Generate Report
Back to Models
Overview
Add Specification
Specifications
Notes & Admin
Basic Information
Model Name
Status
Draft
Active
Review
Archived
Inactive
Deprecated
Square Footage
Number of Floors
Shell Only
This model is a shell only
Description
Secured commercial truck parking prototype: 10 gross acres, ~7.5 acres surfaced, 150 marked semi stalls (12x75 angled), fenced, gated with access control, security-lit, drained. Aggregate-surfaced floor (full paving is a separate upgrade). Direct-procurement materials basis (COGS only; install labor layered by the GC labor model). Adds a two-tank cardlock diesel fuel program: 2x 10,000 gal UL-142 double-wall ASTs with spill containment, high-flow cardlock dispensing, tank monitoring, and a concrete fueling pad -- same equipment spec as the interchange relay fuel model (74); tank sizing is set by 8,500 gal jobber truckload receiving and redundancy, not by site draw rate, so it is not scaled down for the smaller pilot volume here. Jobber-supplied delivered wholesale (Winnie fuel study, July 2026). DEF/DPF services are third-party vendor-installed and carry no capital here. No canopy, no retail. Pairs with the iVerify truck parking use model.
Save Overview